govt.chinadaily.com.cn

News and Policies

Beijing-Xiongan Intercity Railway

Updated: Jan 18, 2018 exploringtianjin.com Print
Share - WeChat

Construction of the Beijing-Xiongan Intercity Railway is underway, and a railway from Tianjin to Beijing's New Airport is being planned.

Five stations

The Beijing-Xiongan intercity line has five stations -- Huangcun, New Airport, Gu’an East, Bazhou North and Xiongan.

The Beijing-Xiongan intercity railway, located in Beijing and Hebei province, crosses the Daxing district of Beijing, Gu’an county, Yongqing county, Bazhou and Xiongan New Area.

The length is 92.738 km.

350 kilometers/hour

The railway from Liying to the new airport will be 35.883 km long.

From Tianjin new airport to Xiongan New Area is 56.9 km; 10.97 km of which will be covered by the railway.

Langfang-Zhouzhou intercity railway, Tianjin-New Airport railway, Tianjin-Jiulong railway, Beijing-Hong Kong high speed railway and Shijiazhuang-Xiongan intercity railway have been planned.

Tianjin-New airport railway and Tianjin-Jiulong railway are underway at the same time.

The uplink of the Tianjin-New Airport railway is 3.73 km long; the downlink is 3.26 km.

The uplink of the Tianjin-Jiulong railway shares 3.77 km of rail with the Beijing-Xiongan intercity railway, while the downlink shares 3.913 km with the Beijing-Xiongan intercity railway.

The three railways sustain different speeds.

The Beijing-Xiongan intercity railway will has three parts: Beijing Xi-Liying, Liying-New Airport, and New Airport-Xiongan New Area.

The speed of Beijing West-Liying will be 200 km/hour.

The speed of Liying-New Airport will be 250 km/hour.

The speed of New Airport-Xiongan New Area will be 350 km/hour.

Copyright©2024 China Daily. All rights reserved.

京ICP备13028878号-6

京公网安 京公网安备 11010502032503号