govt.chinadaily.com.cn

News and Policies

Construction work finishes on Dongta Bridge

Updated: Mar 8, 2018 Print
Share - WeChat

图片46.jpg

The construction of Dongta Bridge is officially completed on March 6. With a total length of 1,460 meters, and an average width of 40 meters, Dongta Bridge is located between Shenshui East Road in the north and Zhuke Street in the south. The two-way, eight-lane bridge is regarded as the only double tower steel structure self-anchored suspension bridge over Hunhe River in Shenyang. The bridge is expected to open to traffic in the second half of this year. [Photo/Xinhua]


    


Copyright©2024 China Daily. All rights reserved.

京ICP备13028878号-6

京公网安 京公网安备 11010502032503号